When to choose pre-construction vs post-construction termite treatment
Both treatments stop termites, but the timing and application differ. Pre-construction creates a soil barrier before the slab is poured; post-construction involves drilling, injection, and wall/wood treatment in an existing structure. Here’s how to pick the right plan and what Vyom includes in each.
Pre-construction anti-termite (new sites)
- Soil treatment for trenches, plinth beams, and backfill before flooring.
- Coverage around pipes, lift pits, and expansion joints.
- Best time: before flooring/tiling to lock in a long-life barrier.
We coordinate with your contractor to schedule chemical dosing at each stage, ensuring the barrier isn’t broken during later work.
Post-construction anti-termite (existing homes/offices)
- Drill-and-fill along skirting, door frames, and perimeter slabs.
- Injection in kitchen/wardrobe wood if activity is visible.
- Crack sealing and moisture checks to reduce future entry points.
What Vyom includes
- Government-approved, low-odor termiticides.
- Uniformed technicians with PPE and ID cards.
- Service warranty with scheduled follow-ups.
- MSDS available for audits and handover files.
- Coverage areas: Rohini, Pitampura, NSP, Shalimar Bagh, Janakpuri, Punjabi Bagh, Vikaspuri, and nearby.
Signs you need treatment now
- Hollow wood sounds, bubbling paint, or mud tubes on walls.
- Discarded wings near windows/doors, especially after rain.
- Renovation plans or recent neighbor construction disturbing soil.