Color Switcher

Check template with your color

Or custom color..



Pre-Construction vs Post-Construction Termite Treatment

Termite drill and seal treatment

When to choose pre-construction vs post-construction termite treatment

Both treatments stop termites, but the timing and application differ. Pre-construction creates a soil barrier before the slab is poured; post-construction involves drilling, injection, and wall/wood treatment in an existing structure. Here’s how to pick the right plan and what Vyom includes in each.

Pre-construction anti-termite (new sites)

  • Soil treatment for trenches, plinth beams, and backfill before flooring.
  • Coverage around pipes, lift pits, and expansion joints.
  • Best time: before flooring/tiling to lock in a long-life barrier.

We coordinate with your contractor to schedule chemical dosing at each stage, ensuring the barrier isn’t broken during later work.

Post-construction anti-termite (existing homes/offices)

  • Drill-and-fill along skirting, door frames, and perimeter slabs.
  • Injection in kitchen/wardrobe wood if activity is visible.
  • Crack sealing and moisture checks to reduce future entry points.

What Vyom includes

  • Government-approved, low-odor termiticides.
  • Uniformed technicians with PPE and ID cards.
  • Service warranty with scheduled follow-ups.
  • MSDS available for audits and handover files.
  • Coverage areas: Rohini, Pitampura, NSP, Shalimar Bagh, Janakpuri, Punjabi Bagh, Vikaspuri, and nearby.

Signs you need treatment now

  • Hollow wood sounds, bubbling paint, or mud tubes on walls.
  • Discarded wings near windows/doors, especially after rain.
  • Renovation plans or recent neighbor construction disturbing soil.

Book a termite inspection

Same-day and next-day slots available.

Call +91 9217275294